The inline rink in Brentwood’s Memorial Park, which reopened this spring after a new concrete surface poured and new dasher boards installed, closed last month for maintenance and is set to reopen Nov. 3.
Brentwood recreation supervisor, Brad Barbeau said the caulk in the joints on the playing surface was peeling and had to be ripped out and redone.
After the new caulk dries, Barbeau said the lines will be repainted because that has started to peel too.
See also: Brentwood inline rink in last phase